Free Signaller job simulation and situational judgement practice
The job simulation puts you in the chair and asks what you would do. Applicants describe it as long. You are sat before any training, so it is not testing rule-book knowledge — it is testing whether your instinct is to stop when you are unsure, to confirm rather than assume, to own a mistake, and to hold the line when someone is pushing you to go faster. The safety-led answer is almost always the right one. What separates candidates is the pairs where two answers are both defensible and you have to pick the one that deals with the danger first.
Read the full job simulation guide →
New to railway terms? The words used in these scenarios, explained
The real assessment is sat before any training, so you are not expected to know railway vocabulary. Ours uses some because it makes each scenario precise — here is what it means. Open the full list in a new page.
- Signal box (the box)
- The building or control room a signaller works from. Large modern ones are usually called signalling centres or rail operating centres.
- Control
- The operations control centre that manages the train service across a route — handling delays, incidents and resources — and works alongside signallers.
- Section (in section)
- A stretch of line between signals or between signal boxes. A train that is “in section” is out on that stretch of line, rather than standing at a station or signal.
- Points
- The movable parts of the track that guide a train from one line onto another. Sometimes called switches.
- Aspect
- What a signal is showing. On a colour-light signal that is red, single yellow, double yellow or green.
- At danger
- A signal showing its most restrictive aspect — on a colour-light signal, red — meaning the train must stop.
- SPAD
- Signal passed at danger: a train going past a signal showing stop without permission to do so.
- Track circuit
- A low-voltage electrical circuit running through the rails that detects whether a train is on a stretch of track and shows it on the signaller's display.
- Line blockage
- An arrangement in which the signaller keeps trains off a stretch of line so that people can work on or near the track safely.
- Possession
- A planned closure of a line for engineering work, usually longer and larger than a line blockage, during which normal trains do not run over that stretch.
- Person in charge (of a work site)
- The person responsible for the safety of a group working on or near the line, who arranges protection with the signaller. The formal job title varies with the type of work.
- Protecting the line
- Making sure no train can run onto a stretch of line — for example by keeping the signals leading onto it at danger.
- Giving up a blockage (handback)
- When the person in charge tells the signaller the work is finished and everyone and everything is clear, so trains can use the line again.
- Cautioning a driver (running at caution)
- Telling a driver to go forward at a speed at which they can stop short of anything in the way.
- Repeat back
- Saying a safety-critical message back to the person who gave it, so both of you know it was received correctly.
- Wrong-side failure
- A fault that leaves the railway less safe than it should be — for example a signal showing proceed when it should show stop. A fault that fails to the safe state instead is a right-side failure.
- Reminder appliance
- A physical device or on-screen marker a signaller applies to a signal or points control, so that they cannot clear that signal or move those points by mistake.
- Automatic route setting
- A computer system in modern signalling centres that sets routes for trains automatically, with the signaller able to take over manually.
- User-worked crossing
- A level crossing with gates that people open themselves, often with a telephone to call the signaller before crossing with a vehicle or animals.
- Lookout
- A person whose job is to watch for approaching trains and warn a group working on or near the line.
- Speed restriction
- A lower speed limit on a stretch of line, often temporary, shown by boards beside the track.
- Fouling a line
- Being close enough to a line that a passing train could strike you or the object in question.
- Light engine
- A locomotive running on its own, without any wagons or coaches attached.
- Working timetable
- The detailed timetable used by railway staff, including trains and timings that do not appear in the public timetable.
Try a free sample
A member of the public rings the box to say they have seen someone walking along the track about half a mile from your signal. They sound certain but they cannot tell you exactly where. Two trains are approaching the area. What do you do first?
Unlock all 5 Signaller assessment sections
One payment unlocks every section of the signaller online assessment — multi-tasking, concentration, job simulation, memory grid, questionnaire briefing — with full question banks and unlimited mock tests. Also includes level crossing scenarios from our other practice. One-time payment, no subscription.
These are original practice exercises written to reflect the assessment format described by recent Network Rail signaller applicants. Network Rail publishes the stages of its signaller recruitment but not the exercises in its online assessment, so treat the format as reported rather than official, and always follow the guidance sent with your own application. These are not the official exercises, and this site is not affiliated with or endorsed by Network Rail.
